Teach Time Encyclopedia - Learn About Our World
Home Page
Teach Time
Featured Topics

United States
by state

CITYology

Academic Disciplines

Historical Timelines

Themed Timelines

Calendars

Reference Tables

Biographies

How-tos



Sunday, October 12, 2008

Thames Barrier

The Thames Barrier is a flood control structure on the River Thames at Woolwich Reach in London. It is the world's largest movable flood barrier.


River Thames Flood Barrier

Built across a 523 m stretch of the river the barrier divides the river into six channels between nine large concrete piers. The flood gates across the openings are radial - they operate by rotating, rising by hydraulics out of a horizontal sill below the water to form the barrier, they can rotate further to allow for 'underspill' or maintenance. The four large central gates are made of steel and are each 61 metres long, 10.5 metres high and weigh 1,500 tonnes.

London is vulnerable to flooding. The threat has increased over time due to the slow but continuous rise in high water level over the centuries (75 cm / 100 years) and the slow 'tilting' of Britain (up in the north and down in the south). This general rise in potential water levels combined with the tidal conditions of the Thames and with particularly severe weather conditions can create serious flood conditions - surge tides. After 300 people died in flooding in 1953 the issue gained new prominence. Early proposals at a flood control system were stymied by the need for a large opening in the barrier to allow for vessels from London Docks to pass through. When containerization came in and a new port was opened at Tilbury a smaller barrier became feasible.

The barrier was designed by Rendel, Palmer and Tritton for the GLC, the concept of the rotating gates was devised by Charles Draper. The site at Woolwich was chosen because of the relative straightness of the banks, and the underlying river rock was strong enough to support the barrier. Work began at the barrier site in 1974 and construction was largely complete by 1982. In addition to the barrier itself the flood defences for 11 miles down river were raised and strengthened. The barrier was officially opened on May 8, 1984. Total construction cost was around £500 m with an additional £100 m for river defenses. The barrier was designed to cope with sea level rises until around 2030. Since 1982 the barrier has been raised over 70 times; further, it is always raised every month for testing. The barrier operations was operated by the National Rivers Authority until April 1996 when it passed to the Environment Agency.

External Link



Internet Hotel Solutions

Site Sponsors
AC Units
Baltimore Harbor
Boot Camp Grads
Bra Size
Burkittsville
College Hotels
Digital Harbor
Free Cell Phones
Golden Hare Travel
Golf Vacations
Golf Courses
Gourmet
Hair Styles
Hippodrome
iWoman
Lesson Plans
Maryland Hotels
MD Genealogy
Minor League Stuff
Motel Site
Ocean City
OC Real Estate
Old Agers
Office Supplies
Orlando
Pet Friendly Hotel
Room Prices
Savannah, GA
Ski Vacations
South Baltimore
Student Teaching
Travel Sources
University Hotels
Visit Military Bases
Washington, DC

Brought to you by NoChildLeftBehind.com and the Beaches and Towns Network, LLC.